15 outdoor Toronto pools opening early this weekend

1 day ago 2

Toronto

While the afloat summertime docket for metropolis pools starts June 28, the metropolis has announced it's opening 15 outdoor pools up of schedule. They’ll enactment unfastened until mid-September.

All outdoor pools volition unfastened connected a afloat docket connected June 28

CBC News

· Posted: Jun 13, 2025 3:12 PM EDT | Last Updated: 1 hr ago

Aerial (drone) images of radical   enjoying the formation  on  Lake Ontario, Sunnyside formation  and Sunnyside Gus Ryder Outdoor Pool, opened aboriginal  owed  to utmost  precocious   weather.

While the afloat summertime docket for metropolis pools starts June 28, the metropolis has announced it's opening 15 outdoor pools up of schedule. They'll enactment unfastened until mid-September. (Patrick Morrell/CBC News)

With lukewarm and humid conditions making their summertime comeback, the City of Toronto is offering immoderate aboriginal alleviation from the heat.

While the afloat summertime docket for metropolis pools starts June 28, the metropolis has announced it's opening 15 outdoor pools up of schedule. They'll enactment unfastened until mid-September.

Outdoor pools opening Saturday:

  • Alex Duff Memorial Pool (Christie Pits Park).

  • Alexandra Park.

  • Broadlands Community Recreation Centre.

  • Donald D. Summerville Olympic Pools.

  • Gord and Irene Risk Community Recreation Centre.

  • Goulding Community Recreation Centre.

  • Halbert Park.

  • Maryvale Park.

  • McGregor Park Community Centre.

  • O'Connor Community Centre.

  • Pine Point Park Outdoor Pool.

  • Riverdale Park East.

  • Roding Community Centre.

  • Sunnyside Gus Ryder Outdoor Pool.

  • West Mall Outdoor astatine Dennis Flynn Park.

The pools volition beryllium unfastened weekdays from 4 to 8 p.m. and weekends from 10 a.m. to 8 p.m. 

Splash pads are present unfastened crossed the metropolis and wading pools volition unfastened connected June 27.

All different outdoor pools volition unfastened connected a partial docket connected Saturday, June 21 and connected a afloat docket connected Saturday, June 28.

Read Entire Article